Widget 5000 Project Home Page

Project Vision: To create easy-to-use widget software with which users can be productive within 20 minutes of completing installation.

Percent of Schedule Used (Actual/Planned) 45% / 45%
Percent of Resources Used (Actual/Planned) 43% / 40%
Percent of Defects Found (Actual/Planned) 17% / 15%
Project Tracking
  • Current Task List (TBD)
  • Current Defect List (TBD)
  • Top 10 Risks List (TBD)
  • Project Manager's Status Reports (TBD)
  • Software Project Log (TBD)
Project Planning
  • Change Control Plan (TBD)
  • Software Development Plan (TBD)
  • Quality Assurance Plan (TBD)
  • Staged Delivery Plan (TBD)
  • Individual Stage Plans (TBD)
  • Detailed Software Construction Plans (TBD)
  • Software Project History Document (TBD)
 
Technical Work Products
  • User Interface Prototype (TBD)
  • User Interface Style Guide (TBD)
  • User Manual/Requirements Specification (TBD)
  • Architecture Document (TBD)
  • Detailed Design Documents (TBD)
  • Software Integration Procedure (TBD)
  • Company Coding Standard (TBD)
Project Deliverables
  • Current version of Widget 5000 (TBD)
  • Deployment Document / Cutover Handbook (TBD)
  • Release Checklist (TBD)
  • Release Approval (TBD)
 

Anonymous Feedback Channel

Please use the anonymous feedback form to post anonymous feedback about the project, which is accessible to all project team members, the project manager, and upper management.